Check — Verifying Results Against The Plan

In the Check phase the pilot data sits directly alongside the baseline and target figures from the Plan phase. The evaluation turns on one narrow question: did the intervention deliver the result that was predicted?

A pilot normally produces one of three realities — the countermeasure hit its mark, it moved nothing, or it caused unintended harm. All three carry value, because a disproven hypothesis still sharpens understanding by eliminating a wrong assumption.

Key Concept
The Check phase is a rigorous audit of pilot results against the original projection, paired with candid analysis of any shortfall.
Practical Example
The fulfilment team sees damage returns fall to 8 percent rather than the projected 3 percent, and the pilot log reveals weekend temporary staff were never shown how to fold the new inserts for oversized boxes.

Standard Procedure

  1. 1Benchmark actual pilot metrics against both the baseline and the target.
  2. 2Judge whether the shift is a real improvement or routine fluctuation.
  3. 3Diagnose the reasons behind any gap between forecast and outcome.
  4. 4Cross-reference the numbers with the deviation log from the Do phase.

Lesson Summary

  • ✓Checking audits real trial data directly against the planned target.
  • ✓A disproven hypothesis is still a productive result, because it rules out a flawed assumption.
  • ✓Explaining why results diverged matters as much as calculating them.